CW
CW / Cixing develops application-specific bearings and precision transmission items through a global manufacturing network. Define the engineering duty and production-approval plan, then match the actual manufacturing site to its certificate and release evidence.
Approve the application and the manufacturing site together.
CW’s accessible international site links the brand to Cixing Group and describes custom bearing engineering and production support. The Ningbo market-regulation brand platform independently identifies CW as Cixing’s bearing brand. For procurement, the useful distinction is between the group, the plant making your item and the sales/logistics entity supplying it—not simply the logo on a quotation. Official group relationship [1] Government brand record [2]
Choose the actual development route before requesting a catalogue price.
The official range includes deep-groove and e-mobility bearings, angular-contact and four-point forms, special/roller bearings, ball screws and worm shafts. The range page allows application-specific internal design, including contact-angle adjustments and split-inner-ring four-point arrangements. These are design routes, not proof that any stock model meets the buyer’s load case. Actual product range [3]
Motor or gearbox bearing
Provide envelope and mating drawings, duty cycle, radial/axial loads, speed/acceleration, thermal conditions and installed torque/noise limits. Identify the actual electrical and contamination environment where relevant.
Angular-contact or four-point arrangement
Define axial load directions, stiffness, positioning, mounting and preload/clearance. Obtain the complete offered arrangement and assembly drawing; a family label does not approve load sharing or a split-ring mounting procedure.
Ball screw or worm shaft
Provide the controlled transmission drawing, stroke/load or torque/speed duty, accuracy, interfaces and acceptance. Treat it as a separate engineered supplied item, rather than deriving its specification from a bearing quote.
Ask who owns calculations, drawing revisions and design approval, what assumptions apply and which sample/production evidence will be delivered. Sample, tooling and validation costs, MOQ and present capacity require a project-specific quote.
A speed index is not a universal rpm rating or electrical qualification.
CW’s e-mobility page discusses n × dm = 1.4 million mm/min and optimisation of raceways, ball set, cage, seals and grease for high speed, acceleration and heat. This is application guidance, not a permitted rpm for every bearing. Request the speed/index definitions and calculations for the actual geometry, duty and build, with thermal and lubrication assumptions. Actual e-mobility guidance [4]
The original brochure describes 100Cr6 rings with special heat treatment, optional carbonitriding, HNBR noncontact seals, material alternatives at elevated heat and a PA46-GF30 cage example. Its hybrid section describes bearing-steel rings with Si₃N₄ ceramic balls. These are published design options; “hybrid” does not mean all-ceramic rings, and the discussion supplies no universal order-specific insulation voltage or assembled-system approval. Original brochure, pages 4–6 [5]
Mechanical and thermal release
Agree friction/torque, temperature, vibration/noise and endurance criteria under specified acceleration, load, speed and lubricant conditions. Link results to actual rings, balls, cage, seals and fill.
The brochure describes application engineering, simulation and test benches for endurance, friction, speed, noise/vibration, leakage and salt spray, plus lubricant analysis and dimensional/clearance measurements on request. Agree test boundary conditions, sample identity and report content; equipment availability is not a completed result or accredited scope for every test. Brochure, page 7 [5]
Make APQP and PPAP an agreed set of deliverables.
CW’s actual custom-solutions page describes requirements, concept/design, A/B/C/D prototypes, testing/validation and transition to series production with APQP/PPAP support. Those terms describe an offered workflow; they do not establish which submission level, evidence or approval a specific order already has. Actual development offer [6]
Requirements and feasibility
Approve application assumptions, drawing/specification revision, design responsibility, failure risks and the proposed manufacturing/component route. Identify acceptance before producing samples.
Prototype validation
Agree each sample stage’s purpose, quantity, build and representative process. Record dimensional and application results and close deviations before accepting the next stage.
Serial-production approval
Specify required PPAP level/customer format, process flow, control plan, measurement-system and capability evidence where required, material/performance results and approval authority. Link the submitted evidence to the actual plant, tools, process and part revision.
For ramp-up and repeat supply, agree lot release, traceability, containment, capacity/lead-time confirmation and approval before material, source, grease/seal, process, tool or manufacturing-site changes. A successful prototype alone does not approve an unreviewed alternative production route.
The Ningbo manufacturing certificate and group support annex have different roles.
On this review date, the DQS customer database lists Ningbo Cixing Bearing and an IATF document download dated 14 May 2026. The actual issuer-hosted PDF retrieved from that link states 50050187 IATF25, IATF number 0488325, revision 6 May 2026 and printed validity until 14 November 2026. It covers design and manufacture of ball bearing, ball cage and ball screw sub-assembly at No. 188, 1st Xinxing Road, Cixi, with USI GWS3ZS. The listing date and the PDF revision date are distinct. Actual issuer database [7] Issuer PDF and annex [8]
The annex lists Cixing Group for purchasing, supplier management, product design, testing and information technology, and identifies separate sales/service/logistics support locations. A support location in an annex is not automatically another certified manufacturing plant. CW’s own download page separately organises certificates for Ningbo, Guangde, Cixi Xunlei, Qidong, US and Mexico locations. Obtain the applicable current certificate and annex for whichever plant is actually making the ordered item. Actual support-location scope [8] Manufacturer site-by-site download organisation [9]
The issuer PDF says certification validity must be verified through its QR code. The issuer database and downloaded document were examined; continuous supervision/QR status and a delivered lot’s conformance are not asserted here. Recheck status and renewal close to order/shipment, particularly because the printed November 2026 expiry is approaching.
The official contact page separates Cixing Group headquarters/Tech Center, Ningbo Cixing plant, other plants and regional sales/warehousing. For China it lists [email protected], group phone +86 574 63101037 and Ningbo plant phone +86 574 63111184. Identify the legal seller, actual plant, shipment origin, engineering owner and nonconformance contact in the order. The previously recorded Chinese web address refused connection in this review; the accessible official international site is used here. Actual plant and contact distinctions [10]
Prepare a CW application and production-approval brief
Tick what you have ready. Copy the full checklist with its current status for your procurement notes.
Checks stay in this page and reset on reload. Nothing is sent to the manufacturer. The inquiry link opens a separate form.
Documented models.
0 model recordsNo documented models yet.
Try broader requirements, or explore the manufacturer’s published product scope.
Explore manufacturers →Evidence, with boundaries.
Our review approach →Facts above are attributed to their source. Buying and qualification steps are BearingIndex editorial suggestions. Sources checked ; this is not the sources’ publication date or an independent factory audit.
- Manufacturer group publicationCW · official Cixing group relationship ↗
Brand/group and global organisation relationship; self-reported capacity, historical financials and customer claims not treated as present order evidence.
- Government brand platform, dated 23 October 2023Ningbo market regulation · Cixing brand story ↗
CW/Cixing identity and dated history; historical capacity, laboratory and organisational claims not converted to current accreditation or availability.
- Manufacturer route, browser readCW · actual product range ↗
Actual development families and design options; no stock-model application qualification inferred.
- Manufacturer application guidance, browser readCW · actual e-mobility guidance ↗
Published n×dm index and design considerations; not a universal rpm, operating-temperature or electrical rating.
- Original manufacturer PDF, extracted and visually checkedCW · original e-mobility brochure ↗
Pages 4–7 describe material/build options, steel-ring/Si3N4-ball hybrid and test services; no universal life, cost saving, insulation voltage or actual completed test inferred.
- Manufacturer development offerCW · actual custom-development workflow ↗
Prototype/validation and APQP/PPAP support; exact contract deliverables and production approval remain order-specific.
- Primary certification issuer, browser readDQS · Ningbo Cixing issuer database ↗
Actual Ningbo record and 14 May 2026 download listing; listing date is distinct from PDF revision, with no QR/continuous supervision status claim.
- Issuer-hosted PDF downloaded through actual browser linkDQS · actual Ningbo IATF certificate and annex ↗
50050187 IATF25, 6 May 2026 revision, 14 November 2026 printed expiry, named manufacturing and remote-support scope; actual ordered site/QR validity and lot conformance require checks.
- Manufacturer download directoryCW · certificates organised by site ↗
Separate production-location certificate routes; manufacturer-hosted older Ningbo PDF not preferred over newer issuer document.
- Manufacturer contact publicationCW · actual plants and regional contacts ↗
Group, plant and sales/warehouse roles and published China contacts; actual seller/plant/shipment route and available delivery not assumed.
Report a source correction → · Return to inquiry checklist ↑
No reviewed model or batch reports are available. Independent verification is not implied.