The company describes full-process traceability, and its 16 January 2024 inspection page says every bearing is checked before leaving. This does not identify which checks are performed on each item versus by sampling, or prove a life test on every bearing. Agree the actual dimensional, rotational, clearance/locking and seal/lubrication checks, methods, calibrated instruments and acceptance record for the lot. Traceability and assembly statement [2] Actual pre-dispatch-check statement [8]
A 25 January 2024 “company strength” image actually viewed shows steel tubes and a GCr15 incoming-product quality document. It is an incoming-material photograph, not Jujian’s ISO certificate or a finished-bearing test report for your lot. Request the applicable current material certificate and its link through manufacturing/assembly to the finished product. Current company certificate originals and candidate test reports were not established in the material reviewed. Actual incoming-material photo and document [9]
- Approve the configuration. Freeze the drawing, materials, locking, seals, grease and marking for a representative first article.
- Approve the evidence. Agree the lot identifiers, material/process records and finished inspection results you will receive.
- Control repeat orders. Require notification before changing material, housing, seal, lubricant, process or manufacturing site; retain a sample/record against the approved revision.
The dedicated contact identifies Wang Wenzhi, mobiles 18903191608 / 18103198797, and Dianli East Street, Linxi Bearing Industrial Park, Xingtai, Hebei. Confirm the engineering owner, sample receiving point, current production scope, quantity, delivery and warranty terms. No enquiry was sent during the review. Actual dedicated contact [10]