KGBAL’s fit guidance discusses cracking, creep/wear, reduced clearance, seizure and deformation associated with unsuitable installation fits. Give the actual shaft/housing tolerances, support geometry, material and temperature range; ask engineering to approve the fit and installed clearance for the selected sliding pair. Do not reuse a rolling-bearing fit or apply a blanket interference rule to every joint. Actual fit and tolerance guidance [6]
Specify radial/axial loads, shocks, oscillation angle/frequency, dwell and reversals, expected cycles, temperature, dirt/water/chemicals and corrosion exposure. For a sealed PTFE construction, agree liner wear, running torque, play and sealing acceptance. Ask for the precise lubrication/cleaning restrictions; do not add grease to a maintenance-free sliding pair without the supplier’s approved instruction.
The equipment page labels high/low-temperature oscillation testing, peel-strength testing, life testing, metrology, material examination and flaw detection. Request the tests relevant to the quoted liner and ring process, with specimen identity, conditions, calibration and pass limits. A photograph of a rig does not establish completed duty validation or accredited scope for every test. Actual named testing equipment [7]
- Review the joint design. Agree dimensions, articulation, fits, sliding pair, seals and thread/attachment details.
- Approve representative samples. Record initial dimensions, play and torque, then test the agreed load/motion/environment cycle.
- Inspect the end condition. Measure wear/play, liner and ring condition, torque and sealing against agreed limits.
- Control repeat manufacture. Link accepted material, liner bonding/treatment and inspection revisions to lot traceability and change notification.