The January 2025 environmental report for a planned 20-million-set/year high-precision EMQ low-noise bearing line identifies the company and 39 Gongye Road site. It describes the older projects as stopped at that time and a proposed reconstruction/expansion. Its planned output and anticipated start date are not achieved production. Original January report, printed pages 1, 16 and 25 [2]
A later October 2025 environmental report for a separate five-million-piece/year automotive window-system guide-component project states that the EMQ project obtained approval on 14 January 2025, reference 慈环建〔2025〕10号, and was still under construction when that report was prepared. Window guide components and the EMQ bearing line are different project scopes. Neither report establishes present commissioning, completion or output as of this review. Original October report, printed pages 13 and 21 [3]
Before committing delivery
Ask which actual line and entity will manufacture your model, its present operating/qualification status and current sample and production slot. Obtain relevant commissioning/acceptance and inspection evidence, then confirm delivery in the order. Do not infer a current shutdown from a historical report, or assume website capacity is available today.
The January proposed process includes purchased rings, grinding, superfinishing, component cleaning, assembly, finished cleaning, inspection and grease/cover operations. This helps frame questions about the offered manufacturing route; it is not proof that every catalogue item is produced on that line or that an individual lot passed. Proposed process, printed page 23 [2]