BearingIndex
THE BEARINGINDEX DIRECTORY

Taide

Qingdao Taide develops automotive precision bearings with a documented specification, sample-feedback and production-approval process. Its clutch and EV motor tables support concrete dimensional checks; integrated water-pump shafts require a different drawing. The 2025 annual report separates established automotive supply from robot flexible-bearing trial and validation work, helping buyers choose an appropriate sourcing stage.

TAIDE · AUTOMOTIVE BEARING DEVELOPMENT AND PRODUCTION APPROVAL

Start with the vehicle subsystem, then approve the bearing and manufacturing route.

Qingdao Taide Bearing Technology Co., Ltd. (青岛泰德轴承科技股份有限公司) publishes automotive air-conditioning clutch, tensioner, electric motor and integrated water-pump bearing products. Its 2025 annual report, published 24 April 2026, describes a customer-led design, sample-feedback and batch-production process. That is a useful starting point for a new component enquiry; the catalogue alone cannot establish approval for your vehicle or assembly. Actual official product and company publication [1] Company annual report, pp. 12–13 [2]

Prepare a sourcing inquiry
01

A clutch replacement needs the complete envelope and interface.

Taide describes its double-row angular-contact clutch bearings as supporting radial load, axial load in both directions and moment load. The actual detail publishes a dimensional table headed in millimetres, including the following examples. These are published dimensions, not a stock or vehicle cross-reference. Actual double-row clutch table [3]

Published designationd × D × B, mmAdditional published CBuyer decision
BD305523 DDK30 × 55 × 23Shown as “--”Request the controlled cross-section and meaning of the suffix; missing C is not zero.
BD406221X2 DDK40 × 62 × 20.625Shown as “--”Confirm the mounting shoulders, width tolerance and retention.
BD406224X2 DDK40 × 62 × 2420.625Do not substitute for the narrower B dimension based on matching bore and outside diameter.

Supply the compressor/clutch assembly drawing, full removed-part marking, pulley interface, fits and retention, belt loads, speed and thermal duty. Ask Taide to identify seal, grease, clearance, cage, accuracy and the meaning of the full suffix on the proposed drawing. Agree torque/noise, leakage and endurance acceptance under the actual duty before a replacement or new assembly is approved.

02

Keep the electric motor and integrated shaft enquiries separate.

EV motor bearing

The actual motor page lists EV6205-2RZ with d/D/B values 25/52/15, alongside other EV6000/6200/6300 entries. Preserve the complete EV and 2RZ designation; request units, tolerances, seal construction and ratings on the approved drawing. The prose identifies high speed, low friction, rapid acceleration and electrical corrosion as requirements, but does not establish a particular ceramic, coating or insulation construction. Actual motor detail and table [4]

Integrated water-pump shaft

The pump detail describes raceways made directly on the shaft and an integrated shaft/bearing arrangement. Its dimensional table includes shaft lengths and overhangs, not just d/D/B. Supply the complete shaft drawing, impeller/pulley locations, fits and loads at both ends; a conventional separate bearing envelope is insufficient. Actual pump construction and dimensional columns [5]

For the motor, provide electrical environment, current paths, speed spectrum, acceleration, load, temperature, lubricant and noise limits. Ask for the proposed electrical-erosion mitigation and relevant validation, rather than assuming “EV” means electrically insulated. For the pump, agree shaft runout, material/hardness, sealing interfaces, assembly load limits and inspection datums. Both routes need actual candidate life and thermal evidence under the agreed test conditions.

03

Use the company’s actual development process to assign deliverables.

The annual report sets out customer specifications → design/evaluation → samples → feedback and revision → approval → batch production. It assigns product design to R&D, process design to production technology, and measurement-system analysis and quality control to the quality department. The official technology page describes the same departmental responsibilities. Actual annual-report operating model, pp. 12–13 [2] Official engineering and test facilities [6]

  1. Define the request. Send a revision-controlled drawing, application duty, applicable customer standards, expected volumes and sample schedule. Ask who owns product design, process approval and quality evidence.
  2. Approve a representative sample. Agree dimensional and material reports, functional/endurance testing, acceptance limits, sample quantities and responsibility for assembly-level validation. Record every change made after feedback.
  3. Approve the production route. Freeze the manufacturing site, process, material, lubricant and inspection plan. Request the applicable customer-required production approval package and change-notification rules.
  4. Agree supply separately. Confirm lead time, capacity allocated to the order, packaging, traceability, delivery and commercial terms after technical approval.

The report says forging, turning, general heat treatment, plastic coating and tin plating are performed by suppliers, with most other production operations completed internally. Ask for supplier/process controls and lot traceability where relevant; do not interpret the factory introduction as every operation being in house. It also describes consignment for some longstanding large customers, which does not establish consignment availability or immediate delivery for a new buyer. Actual production and sales modes [2]

04

A robot flexible-bearing enquiry needs a development milestone plan.

The website presents harmonic-reducer crossed-roller and flexible-bearing categories. More usefully, the 2025 annual report says the dedicated thin-wall flexible-bearing project had entered internal trial and validation, with some samples sent for testing, and had not yet entered batch production at that reporting date. This dated project disclosure should not be replaced by a generic claim that every displayed robot product is mature serial supply. Actual harmonic-reducer categories [7] Actual R&D project progress [2]

Provide the reducer architecture, flexible deformation cycle, speed/load spectrum, required accuracy and assembly constraints. Ask for current project status, sample revision, validation completed and outstanding, first-article schedule and the criteria for a move to small-batch or serial production. Agree who funds and accepts development iterations. A target accuracy in the report is a project goal, not the certificate of your supplied sample.

For a mature replacement requirement, request proof of an already approved equivalent and delivery terms; for a development partnership, evaluate the sample/testing roadmap and engineering access. These are different purchasing decisions.

05

Confirm which company and site will design, make and dispatch the order.

The dedicated contact page lists Qingdao at 10 Xinghua Road, Jiaozhou Runde at 21 Liaoning Road, Bengbu Haode at 5019 Huaishang Avenue, and Yantai Mingde at No. 14, phase II, Oriental Industrial Park. Qingdao/Jiaozhou list 0532-5552-0859 and [email protected]; Bengbu lists 0552-2828090. Confirm the actual legal seller, manufacturing/inspection site and sample receiving point instead of treating the group locations as interchangeable factories. Actual dedicated site contacts [8]

The website advertises management systems and laboratory capability. Obtain the applicable current certificate and accredited test scope for the exact site and activity, plus lot-specific results; equipment photos do not establish that every advertised test is within accredited scope. The annual report’s investor contact is not the engineering enquiry route. Scope of official company claims [1] Published equipment and laboratory description [6]

SAC/TC98 reports that Taide co-hosted a Qingdao bearing-standardisation meeting on 4–6 December 2024. This independently supports the company’s participation in that industry event; it does not certify an individual bearing or prove authorship/compliance with every standard discussed. Actual committee report dated 15 January 2025 [9]

YOUR NEXT STEP

Prepare a Taide component-development enquiry

Tick what you have ready. Copy the full checklist with its current status for your procurement notes.

Checks stay in this page and reset on reload. Nothing is sent to the manufacturer. The inquiry link opens a separate form.

Materials to prepare
Continue to sourcing inquiry →

Documented models.

0 model records

No documented models yet.

Try broader requirements, or explore the manufacturer’s published product scope.

Explore manufacturers →

Evidence, with boundaries.

Our review approach →

Facts above are attributed to their source. Buying and qualification steps are BearingIndex editorial suggestions. Sources checked ; this is not the sources’ publication date or an independent factory audit.

  1. Official actual company/product publicationTaide · official homepage and company information ↗

    Advertised automotive focus and group capability; not candidate qualification or current certificate validation.

  2. Original company annual report, complete 224-page PDF mirrored by SinaTaide · 2025 annual report (published 24 April 2026) ↗

    Actual operating model, outsourced processes, site/entity definitions and dated robot R&D progress; future goals are not achieved product ratings.

  3. Official actual dimensional tableTaide · double-row clutch bearing detail ↗

    Published d/D/B/C examples in mm; suffix definitions, vehicle approval and stock not established.

  4. Official actual product table and requirementsTaide · EV motor bearing detail ↗

    Complete EV designations and listed dimensions; insulation/material/speed claims require candidate evidence.

  5. Official actual construction and dimensional tableTaide · integrated water-pump shaft detail ↗

    Integrated shaft/raceway and length/overhang columns; not a simple separate-bearing substitute.

  6. Official actual engineering/laboratory descriptionTaide · technology and test organisation ↗

    Department responsibilities and published test facilities; current accredited test scope requires documents.

  7. Official actual category publicationTaide · harmonic-reducer bearing categories ↗

    Crossed-roller/flexible categories; maturity must be checked against project status and current evidence.

  8. Official actual dedicated contact pageTaide · factory and engineering contacts ↗

    Four locations and contact routes; confirm legal seller and manufacturing/receiving site for the order.

  9. Primary committee report dated 15 January 2025SAC/TC98 · Qingdao bearing standardisation meeting ↗

    December 2024 event co-host and participation; not product certification or universal standard compliance.

Report a source correction → · Return to inquiry checklist ↑

Taide published product scope reviewed

The manufacturer website describes automotive precision and electric-drive bearings.

Scope: Official website product scope only. No independent factory audit, material-report review or model-level performance validation is implied.

Company-level record; not a model test report · 2026-09-24 04:20:33

Source documentation retained for editorial review.